Analyzed end date
From LIMSWiki
Jump to navigationJump to searchIf the aliquot was analyzed over a range of dates (and times, if required), the end of the analysis period.[1]
References
- ↑ SEDD Specification 5.0 http://www.epa.gov/superfund/programs/clp/seddspec5.htm