Analyzed date
From LIMSWiki
Jump to navigationJump to searchThe date (and time, if required) of analysis of an aliquot. If analyzed over a range of dates, this is the start date.[1]
References
- ↑ SEDD Specification 5.0 http://www.epa.gov/superfund/programs/clp/seddspec5.htm