Difference between revisions of "Template:LIMSpec/Instrument and equipment management"
From LIMSWiki
Jump to navigationJump to searchShawndouglas (talk | contribs) (Created as needed.) |
Shawndouglas (talk | contribs) (Added NIST 800-53 to various items) |
||
Line 49: | Line 49: | ||
[https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.7]<br /> | [https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.7]<br /> | ||
[https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.8]<br /> | [https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.8]<br /> | ||
[https://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.800-53r4.pdf NIST 800-53, Rev. 4, MA-2 and MA-2(2)]<br /> | |||
[https://www.ams.usda.gov/datasets/pdp/pdp-standard-operating-procedures USDA Administrative Procedures for the PDP 5.2.4]<br /> | [https://www.ams.usda.gov/datasets/pdp/pdp-standard-operating-procedures USDA Administrative Procedures for the PDP 5.2.4]<br /> | ||
[https://www.ams.usda.gov/datasets/pdp/pdp-standard-operating-procedures USDA Data and Instrumentation for PDP 5.2]<br /> | [https://www.ams.usda.gov/datasets/pdp/pdp-standard-operating-procedures USDA Data and Instrumentation for PDP 5.2]<br /> | ||
Line 54: | Line 55: | ||
[https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 13.5]<br /> | [https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 13.5]<br /> | ||
[https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 16.23] | [https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 16.23] | ||
| style="background-color:white;" |'''10.7''' The system shall allow the configuration of calibration and maintenance frequency and time frames, | | style="background-color:white;" |'''10.7''' The system shall allow for the configuration of calibration and maintenance frequency and time frames for—as well as the manual and automatic scheduling of calibration or maintenance of—equipment, instruments, and systems. Available intervals should be include days, weeks, months, and years. | ||
|- | |- | ||
| style="padding:5px; width:500px;" | | | style="padding:5px; width:500px;" | | ||
Line 78: | Line 79: | ||
[https://www.epa.gov/quality/guidance-quality-assurance-project-plans-epa-qag-5 EPA QA/G-5 2.2.6–7]<br /> | [https://www.epa.gov/quality/guidance-quality-assurance-project-plans-epa-qag-5 EPA QA/G-5 2.2.6–7]<br /> | ||
[https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.8]<br /> | [https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.8]<br /> | ||
[https://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.800-53r4.pdf NIST 800-53, Rev. 4, MA-2, MA-2(2), and MA-6(1)]<br /> | |||
[https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 16.23] | [https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 16.23] | ||
| style="background-color:white;" |'''10.10''' The system shall be able to show all instances of scheduled calibration, preventative maintenance, and service dates for an instrument. | | style="background-color:white;" |'''10.10''' The system shall be able to show all instances of scheduled calibration, preventative maintenance, and service dates for an instrument. | ||
Line 105: | Line 107: | ||
[https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.8]<br /> | [https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.8]<br /> | ||
[https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.13]<br /> | [https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.13]<br /> | ||
[https://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.800-53r4.pdf NIST 800-53, Rev. 4, CM-8]<br /> | |||
[https://www.ams.usda.gov/datasets/pdp/pdp-standard-operating-procedures USDA Administrative Procedures for the PDP 7.2] | [https://www.ams.usda.gov/datasets/pdp/pdp-standard-operating-procedures USDA Administrative Procedures for the PDP 7.2] | ||
| style="background-color:white;" |'''10.13''' The system shall be able to uniquely identify each instrument and any associated components and maintain that and other information—such as manufacturer, model number, serial number, and calibration and maintenance history—within the system. | | style="background-color:white;" |'''10.13''' The system shall be able to uniquely identify each instrument and any associated components and maintain that and other information—such as manufacturer, model number, serial number, and calibration and maintenance history—within the system. | ||
|- | |- | ||
| style="padding:5px; width:500px;" |[https://www.astm.org/Standards/E1578.htm ASTM E1578-18 E-3-13] | | style="padding:5px; width:500px;" |[https://www.astm.org/Standards/E1578.htm ASTM E1578-18 E-3-13] | ||
| style="background-color:white;" |'''10. | | style="background-color:white;" |'''10.14''' The system shall be able to automatically take a parent instrument offline when a child instrument or component goes offline. | ||
|- | |- | ||
| style="padding:5px; width:500px;" | | | style="padding:5px; width:500px;" | | ||
Line 134: | Line 137: | ||
[https://www.iso.org/standard/56115.html ISO 15189:2012 5.3.1.4]<br /> | [https://www.iso.org/standard/56115.html ISO 15189:2012 5.3.1.4]<br /> | ||
[https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.4]<br /> | [https://www.iso.org/standard/66912.html ISO/IEC 17025:2017 6.4.4]<br /> | ||
[https://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.800-53r4.pdf NIST 800-53, Rev. 4, MA-2, MA-2(2), and MA-4]<br /> | |||
[http://www.oecd.org/chemicalsafety/testing/oecdseriesonprinciplesofgoodlaboratorypracticeglpandcompliancemonitoring.htm OECD GLP Principles 4.2]<br /> | [http://www.oecd.org/chemicalsafety/testing/oecdseriesonprinciplesofgoodlaboratorypracticeglpandcompliancemonitoring.htm OECD GLP Principles 4.2]<br /> | ||
[https://www.ams.usda.gov/datasets/pdp/pdp-standard-operating-procedures USDA Administrative Procedures for the PDP 5.2.4]<br /> | [https://www.ams.usda.gov/datasets/pdp/pdp-standard-operating-procedures USDA Administrative Procedures for the PDP 5.2.4]<br /> | ||
Line 139: | Line 143: | ||
[https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 15.46]<br /> | [https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 15.46]<br /> | ||
[https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 16.23] | [https://extranet.who.int/prequal/content/who-technical-report-series WHO Technical Report Series, #986, Annex 2, 16.23] | ||
| style="background-color:white;" |'''10. | | style="background-color:white;" |'''10.15''' The system shall be capable of chronologically logging details for scheduled and unscheduled calibration and maintenance activities for each instrument, including calibration status, calibration standard, date and time of calibration or maintenance, work performed, who conducted it, and signatures of those verifying the completed activities. | ||
|- | |- | ||
|} | |} | ||
|} | |} |