Difference between revisions of "Collected end date"

From LIMSWiki
Jump to navigationJump to search
(Created article stub.)
 
(Updated article)
 
Line 1: Line 1:
If the sample was collected over a range of dates (and times, if required), the end of the collection period.<ref>SEDD Specification 5.0 http://www.epa.gov/superfund/programs/clp/seddspec5.htm</ref>
The '''collected end date''', as defined by the [[United States Environmental Protection Agency]] via its [[Staged Electronic Data Deliverable|SEDD Specification]] Version 5.2, is "the date (and time, if required), of the end of the [[Sample (material)|sample]] collection period, if the sample was collected over a period of time."<ref name="SEDD5.2_19">{{cite web |url=https://www.epa.gov/sites/default/files/2019-05/documents/sedd_spec_v5-2-march_2019_508.pdf |format=PDF |title=Appendix A. Data Element Dictionary (DED) |work=SEDD Specification Version 5.2 |author=U.S. Environmental Protection Agency |date=March 2019 |accessdate=22 September 2022}}</ref>


==References==
==References==
<references/>
<references/>
<!---Place all category tags here-->
[[Category:Testing terminology]]

Latest revision as of 20:44, 22 September 2022

The collected end date, as defined by the United States Environmental Protection Agency via its SEDD Specification Version 5.2, is "the date (and time, if required), of the end of the sample collection period, if the sample was collected over a period of time."[1]

References

  1. U.S. Environmental Protection Agency (March 2019). "Appendix A. Data Element Dictionary (DED)" (PDF). SEDD Specification Version 5.2. https://www.epa.gov/sites/default/files/2019-05/documents/sedd_spec_v5-2-march_2019_508.pdf. Retrieved 22 September 2022.