Difference between revisions of "Bias error ration"
From LIMSWiki
Jump to navigationJump to search (Created article stub.) |
m (Corrected links.) |
||
Line 1: | Line 1: | ||
The difference between the result and [[Expected | The difference between the result and [[Expected result|expected result]] as a fraction of the square root of sum of squares of the [[Result uncertainty|result uncertainty]] and [[Expected result uncertainty|expected result uncertainty]].<ref>SEDD Specification 5.0 http://www.epa.gov/superfund/programs/clp/seddspec5.htm</ref> | ||
==References== | ==References== | ||
<references/> | <references/> |
Revision as of 21:41, 2 May 2011
The difference between the result and expected result as a fraction of the square root of sum of squares of the result uncertainty and expected result uncertainty.[1]
References
- ↑ SEDD Specification 5.0 http://www.epa.gov/superfund/programs/clp/seddspec5.htm