Difference between revisions of "User:Shawndouglas/sandbox/sublevel4"
From LIMSWiki
< User:Shawndouglas | sandbox
Jump to navigationJump to searchShawndouglas (talk | contribs) |
Shawndouglas (talk | contribs) |
||
Line 1: | Line 1: | ||
Finally, the vendor should be able to provide all necessary documentation at each stage of implementation. They should provide not only a top-level requirements specification, but also a full statement of work (SOW) with detailed tasks, which then can serve as work tickets during implementation. These and other documents such as verification and validation materials, training materials and records of meetings and other communications together constitute comprehensive documentation of the project. Not only does strong documentation cover liability issues, but it also ensures more rapid and cost-friendly implementations. | |||
Revision as of 21:22, 9 March 2022
Finally, the vendor should be able to provide all necessary documentation at each stage of implementation. They should provide not only a top-level requirements specification, but also a full statement of work (SOW) with detailed tasks, which then can serve as work tickets during implementation. These and other documents such as verification and validation materials, training materials and records of meetings and other communications together constitute comprehensive documentation of the project. Not only does strong documentation cover liability issues, but it also ensures more rapid and cost-friendly implementations.