Difference between revisions of "Bias error ration"

From LIMSWiki
Jump to navigationJump to search
(Created article stub.)
 
m (Corrected links.)
Line 1: Line 1:
The difference between the result and [[Expected Result|expected result]] as a fraction of the square root of sum of squares of the [[Result Uncertainty|result uncertainty]] and [[Expected Result Uncertainty|expected result uncertainty]].<ref>SEDD Specification 5.0 http://www.epa.gov/superfund/programs/clp/seddspec5.htm</ref>
The difference between the result and [[Expected result|expected result]] as a fraction of the square root of sum of squares of the [[Result uncertainty|result uncertainty]] and [[Expected result uncertainty|expected result uncertainty]].<ref>SEDD Specification 5.0 http://www.epa.gov/superfund/programs/clp/seddspec5.htm</ref>


==References==
==References==
<references/>
<references/>

Revision as of 21:41, 2 May 2011

The difference between the result and expected result as a fraction of the square root of sum of squares of the result uncertainty and expected result uncertainty.[1]

References