Difference between revisions of "Collected date"

From LIMSWiki
Jump to navigationJump to search
(Created article stub.)
 
(Updated article)
 
Line 1: Line 1:
Date (and time, if required) the sample was collected. If collected over a range of dates, this is the start date.<ref>SEDD Specification 5.0 http://www.epa.gov/superfund/programs/clp/seddspec5.htm</ref>
The '''collected date''', as defined by the [[United States Environmental Protection Agency]] via its [[Staged Electronic Data Deliverable|SEDD Specification]] Version 5.2, is "the date (and time, if required) the sample was collected. If the sample was collected over a range of dates, this is the start date."<ref name="SEDD5.2_19">{{cite web |url=https://www.epa.gov/sites/default/files/2019-05/documents/sedd_spec_v5-2-march_2019_508.pdf |format=PDF |title=Appendix A. Data Element Dictionary (DED) |work=SEDD Specification Version 5.2 |author=U.S. Environmental Protection Agency |date=March 2019 |accessdate=22 September 2022}}</ref>


==References==
==References==
<references/>
<references/>
<!---Place all category tags here-->
[[Category:Testing terminology]]

Latest revision as of 20:41, 22 September 2022

The collected date, as defined by the United States Environmental Protection Agency via its SEDD Specification Version 5.2, is "the date (and time, if required) the sample was collected. If the sample was collected over a range of dates, this is the start date."[1]

References

  1. U.S. Environmental Protection Agency (March 2019). "Appendix A. Data Element Dictionary (DED)" (PDF). SEDD Specification Version 5.2. https://www.epa.gov/sites/default/files/2019-05/documents/sedd_spec_v5-2-march_2019_508.pdf. Retrieved 22 September 2022.